Urban Plast

Gypsum Advantage

  • Smooth Finish
  • Cost effective
  • Light weight
  • Great bonding
  • No Shrinkage cracks
  • No water curing required
  • Thermal Resistance - Heat Reduction
  • IGBC approved material for Green Building
  • Non-combustible
  • Major cost of putty is reduced.
    (Only touch-up putty is required)

Uses

  • Normal bare brick Walls
  • Hollow concrete blocks
  • Columns
  • R.C.C Ceilings
  • Solid Backgrounds

Urban Plast Advantage

  • Products of superior quality
  • On-time deliveries
  • Competitive price

Product Specification

PARAMETERS UNIT SPECIFICATIONS
COLOUR - WHITE
INITIAL SETTING TIME MIN 8-12
FINAL SETTING TIME MIN 16-22
COMPRESSIVE STRENGTH N/mm3 15-17
FINENESS % 200 mesh sleve pass>96%
WATER STUCCO RATIO % 70-75
BULK DENSITY Gr/cm3 0.97
MOLECULAR MASS Gr/cm3 145

Cement Plaster Vs Gypsum Plaster

PARAMETERS CEMENT PLASTER GYPSUM PLASTER
CURING Curing required No curing required
PUTTY 2-3 coats of putty required Rough putty required
FINISH Rough Finish Smooth Finish
WAITING PERIOD 9 days3 Immediate, No delay
INITIAL SETTING TIME (MIN) 30 8-12
FINAL SETTING TIME (MIN) 600 16-22
Compressive STRENGTH
(N/mm2)
5-7.50 16-17

RATE ANALYSIS - GYPSUM PLASTERING

(Considering 12 mm thickness)

SL.NO DESCRIPTION UNIT QTY RATE AMOUNT REMARKS
A MATERIAL COST
GYPSUM Kg 11.84 9.0 106.52 Rs.225/bag
1sqft=1.1kg
Add wastage (3%) 3.20
Cost of mesh sqm 1 15.0 15.00
B Labour charges
Hacking charges sqm 1 11.0 11.00 Rs.12/sft
L/c for plastering
(including scaffolding)
sqm 1 129.1 129.12
Material Shifting sqm 1 8.0 8.00
Cleaning sqm 1 2.5 2.50
C Rough coat putty labour sqm 1 10.5 10.50
Rough coat putty material kg 1 16.0 16.00
Rate / Sqm 301.84
Rate / Sft 28.05  

RATE ANALYSIS - CEMENT PLASTERING

12mm thk cement plastering (1:5)

SL.NO DESCRIPTION UNIT QTY RATE AMOUNT REMARKS
A Material cost Consider rate as Rs.320/- (per 50Kg Bag)
Cement Kg 3.560 6.4 22.78 Rate Rs.48/ cft
Sand Cum 0.014 1695.1 23.27
Add Wastage (3%) 1.38
Cost of mesh sqm 1 15.0 15.00
B Labour charges
Hacking charges sqm 1 11.0 11.00
L/c for plastering
(including scaffolding)
sqm 1 129.1 129.12 Rs.12/sft
Material shifting sqm 1 20.0 20.00
C Putty labour sqm 1 21.0 21.00 1 sqft = 0.185kg
Putty material kg 1.9906 16.0 31.85
Rate / Sqm 295.40
Rate / Sft 27.45